A Divyarshi AI product family

Accreditation · NAAC · NBA · UGC

Accreditation evidence as a by-product of daily work.

Marks, mentoring, grievances and certificates are recorded as people work, so the numbers an assessor asks for already exist. Below is every area we cover, with what runs in production today and what doesn't.

NAAC is changing its model, but it still asks for the same evidence.

NAAC has stopped new grading under its Revised Accreditation Framework and proposed two new tracks: Basic (Binary) Accreditation and Maturity-Based Graded Levels. In its April 2026 notice both were still proposed, and no new criteria or metric list had been published.

Whatever the final form, assessors will still ask for the same records: outcome attainment, mentoring, feedback, grievance redressal and results. So we group the evidence below by the seven criteria institutions already know, and will map it to the new framework when NAAC publishes it.

NBA now asks UG engineering programmes for a fresh self-assessment report on e-NBA. Its 2026 Tier I manual has nine criteria and 11 programme outcomes.

NAAC

Evidence for each NAAC criterion.

Grouped by the seven criteria institutions already work to, so your IQAC can see where each record helps.

Criterion 2

Teaching, learning and evaluation

The heaviest criterion: enrolment, learner support, mentoring, evaluation and outcome attainment.

Criterion 3

Research, innovations and extension

Publications, citations and research profiles for every faculty member.

  • Research profile from ORCID with citations, h-index and a publication list that fills itself In production Career & Research
  • Scopus as a data source, with the institution's own Scopus licence Switched on per institution Career & Research

Criterion 4

Infrastructure and learning resources

Evidence that ICT and e-learning are used in teaching, not just installed.

  • LMS course pages with watch-time that counts only real viewing In production LMS
  • Classrooms that record themselves from the timetable In production LectureLens
  • Learning analytics for the whole institution In production LMS

Criterion 5

Student support and progression

Grievance redressal, support schemes and what happens to students after they leave.

  • Grievances filed anonymously if wished, with committees, deadlines and appeals In production Helpdesk & Grievance
  • Grievance register for any period, as CSV and PDF Switched on per institution Helpdesk & Grievance
  • Lifecycle status from active student to alumni, with history In production Student Lifecycle (SLCM)
  • Placement drives and offers Not in Intelversity today
  • An alumni network and alumni office (Alumni Connect, demo ready, pilot next) Not in Intelversity today

Criterion 6

Governance, leadership and management

E-governance across offices and an IQAC that works from real numbers.

Criterion 7

Institutional values and best practices

Gender sensitivity, wellbeing and a safe campus, with records to show for it.

  • Daily Pulse wellbeing check-in that alerts the student's own mentor In production Daily Pulse & Wellbeing
  • Crisis protocol routing to guardian, doctor, psychiatrist or the Internal Complaints Committee In production Mentor-Mentee
  • Ragging and harassment grievance categories In production Helpdesk & Grievance

NBA and outcome-based education

CO-PO attainment from real marks.

Map outcomes once; every assessment after that feeds attainment without a spreadsheet.

Outcomes

CO-PO mapping

The base of every NBA self-assessment: course outcomes mapped to programme outcomes.

  • NBA's 12 engineering POs from the earlier manual loaded in one click, plus PSOs In production OBE & IQAC (NAAC, NBA)
  • The 11-PO set of NBA's 2026 Tier I manual loaded in one click Not in Intelversity today
  • CO-PO matrix with strength 1-3 and a Bloom-verb check on each CO In production OBE & IQAC (NAAC, NBA)
  • Programme educational objectives (PEOs) Not in Intelversity today

Attainment

Direct and indirect attainment

Attainment worked out from marks, not typed into a spreadsheet the week before the visit.

Continuous improvement

Targets and action plans

Evidence that targets were set, missed targets were reviewed and something was done.

  • Committee target per PO that can be raised, never lowered In production OBE & IQAC (NAAC, NBA)
  • Target-versus-attained review with an action plan per PO In production OBE & IQAC (NAAC, NBA)
  • A compiled course file per course Not in Intelversity today

UGC and national systems

Grievances, national IDs, certificates and returns.

UGC 2023

Student grievance redressal

Committees, deadlines and appeals for every grievance, with a register you can produce.

  • Configurable committees with chairperson, convener, members and an appeal stage In production Helpdesk & Grievance
  • Named SGRC and Ombudsperson roles with the statutory day limits Not in Intelversity today

ABC · APAAR · DigiLocker

Student IDs and documents

National IDs captured once and documents verified at source.

  • ABC / APAAR ID captured and format-checked at admission In production Application Portal
  • DigiLocker fetch of board-signed mark sheets, once the institution has NeGD credentials Switched on per institution Application Portal
  • Uploading credits to ABC, or certificates to NAD Not in Intelversity today

Certificates

Verifiable certificates

Employers and other universities check a certificate without writing to you.

NIRF · AISHE

Data returns

The numbers these returns ask for live in Intelversity; the returns themselves are filed by you.

  • Student, faculty, result and fee data exported to CSV and Excel In production Security & DPDP
  • AISHE code stored on each programme In production Student Lifecycle (SLCM)
  • Ready-made NIRF or AISHE return files Not in Intelversity today

Self-check

Where would Intelversity help your IQAC first?

Eight statements. Answer each one, and every "not yet" points at the module that keeps that evidence.

  1. CO-PO attainment is worked out from actual marks, not typed into a sheet.

    Kept by OBE & IQAC (NAAC, NBA)

  2. Every student has a mentor, and meetings are on record.

    Kept by Mentor-Mentee

  3. Slow and advanced learners are identified, with the reason recorded.

    Kept by Mentor-Mentee and LMS

  4. Every grievance has an owner, a deadline and an appeal route.

    Kept by Helpdesk & Grievance

  5. Teaching runs on an LMS whose use you can show an assessor.

    Kept by LMS and LectureLens

  6. Faculty research profiles update themselves.

    Kept by Career & Research

  7. Employers verify your certificates without writing to you.

    Kept by Student Lifecycle (SLCM) and Examination Control

  8. IQAC figures come from one system, with the source of each number.

    Kept by OBE & IQAC (NAAC, NBA)

Answer the statements above to see where Intelversity would help first.

Questions we get asked

Does Intelversity write our SSR, AQAR or NBA SAR?

No. It keeps the records and works out the numbers, such as attainment, pass percentages and mentor ratios, and exports them to Excel and PDF. Your IQAC writes and submits the report.

Will this still help under NAAC's new Binary and MBGL framework?

Yes. The new framework had not been published when we last checked, but every version so far asks for evidence of outcomes, mentoring, feedback and grievance redressal. We will map our records to the new criteria once NAAC publishes them.

Does it follow NBA's 2026 Tier I manual?

Course-outcome attainment from internal and end-semester marks works the same way. The one-click PO list is the earlier 12-PO set; the 2026 manual uses 11, and programme educational objectives (PEOs) are not in Intelversity yet. Tell us which manual your programme follows and we will show you how it fits.

Is the direct-to-indirect weighting fixed at 80:20?

NBA's 2026 manual does not prescribe a weighting; 80:20 is common practice. Indirect attainment comes from course-exit surveys, which we switch on per institution. Tell us the weighting your programme uses.

Does it meet the UGC grievance regulations of 2023?

Grievances have committees, deadlines and an appeal stage, and can be filed anonymously. Named SGRC and Ombudsperson roles with the statutory day limits are not built yet; in the meantime you can set up your SGRC as a committee.

Can we see it with our own programmes?

Yes. The demo runs on a sample institution with fictional data, set up with your programmes, outcomes and terms, so your IQAC sees its own structure.

Show it to your IQAC.

We walk your IQAC coordinator through attainment, mentoring and grievance records on a sample institution with fictional data.

See it with your own programmesBook a demo